Not sure why this was commented out (maybe a stopgap measure?) but it shouldn't be commented out.
Extra logging
Not entirely sure what's the root of this, but when using image transfers the availability window doesn't seem to get properly cached. This fix seems to shave ~30% off the time it takes to run the simulations that involve image transfers.
Preparation scheduling for AR leases was broken. THere were cases when it would schedule an image transfer that was actually infeasible.
Since preparation scheduling can result in an infeasible lease, preemptions should be done after the preparation has been scheduled.
Fixed wrong handling of attributes in multiconfig files
haizea-convert-data now supports data files with different sets of attributes/metrics (files without a given attribute/metric just report it as an empty string)
- Modified LWF generator so it won't have an empty ramp-up period.- Minor fixes here and there.
Fixed bug when determining the "first start" of a VMRR. Shouldn't include the migration RRs.
View revisions
Also available in: Atom